I-5 Bridge Replacement Project receives $600 million federal grant
PORTLAND, Ore. (KOIN) — Washington state’s federal lawmakers announced Friday that the Interstate Bridge Replacement (IBR) Program will receive a $600 million federal grant to move the project forward.
IBR is the organization tasked with replacing the Interstate Bridge (also known as the I-5 Bridge) connecting Portland and Vancouver, which saw an average of 131,747 vehicles cross it in 2021, according to the Southwest Washington Regional Transportation Council.
It is also an integral connector for commuters from both Oregon and Washington, often leaving seven to 10 hours of congestion during the morning and evening traffic periods.
Ramp closures, lane reductions to impact I-205 this weekend
There are also structural issues with the existing bridge, including one span being over a century old and the entire overall structure being at risk of collapse in the event of a major earthquake.
The funding for the replacement will come from a Department of Transportation Mega Grant Program authored by Sen. Maria Cantwell (D-Wash.), funded by Sen. Patty Murray (D-Wash.), and supported by Rep. Marie Gluesenkamp-Perez (D-Wash.-3rd).
“I’m excited these efforts have paid off. This Mega program award will be a major step forward toward strengthening the safety and efficiency of this vital interstate artery,” said Rep. Gluesenkamp-Perez. “I’ll continue working to bring every possible federal dollar home for this project so our local drivers, especially our commuters, and economy can feel the benefits.”
Commissioner Mapps charts out plan for fixing Portland streets
Gluesenkamp-Perez remarked to KOIN 6 News that when she has her two-year-old in the car, she refuses to drive on the bridge due to its instability should an earthquake happen.
“Everybody pulled hard, and we were able to bring these dollars back home for a truly critical piece of infrastructure. So I’m thrilled,” she said.
Early efforts to replace the bridge stalled a decade ago when Oregon lawmakers voted to pay for their share of the project. Then Washington senators rejected paying for their share.
But this grant is the shot in the arm badly needed to fund the current bridge replacement project.
Both Oregon and Washington are competing for other grants from the federal government as well.
TriMet’s Red line improvement plan enters final phase for Portland MAX
Sen. Cantwell told KOIN 6 News that she and other leaders have been at work on this project for decades, stating it’s time for change.
“The region has grown, the bridge didn’t keep pace obviously because of it’s hundred- year-old infrastructure,” said Cantwell. “So it’s time to say we’re not going to have these huge backups and we’ll have a more expansive bridge for our economy.”
Estimates put the total cost of paying for the bridge at $6 billion and construction is expected to start in 2026. But the details of the design are still to be determined. Regardless, Cantwell said the project is about increasing ease of use for everyone who uses the bridge.
“This is about upgrading the capacity of the bridge by adding more lanes and more ease of use so that we can get more people across this bridge,” she said.
Portland city leaders echoed the sentiment of traveler usability being a major win for the project.
“This critical and necessary investment will make for safer commutes in and out of the City,” Mayor Ted Wheeler and Transportation Commissioner Mingus Mapps said in a joint statement. “We are grateful to Washington leadership who championed this effort which will have a positive impact on travelers across the region.”
“This is a big moment for the PNW. Replacing the Interstate Bridge is a critical infrastructure investment that will advance our environmental goals and support local jobs,” said Oregon Gov. Tina Kotek in a social media post.
For the latest news, weather, sports, and streaming video, head to KOIN.com.